Owner:
City of Manchester, NH

Technology:
Primary clarifier and gravity thickner upgrades

Engineer:
Underwood Engineers

Project Value:
$7.6 Million

Project Highlights:
All excavation and concrete work was also performed by the Industrial Services Group


Download Project PDF

Manchester, NH - Primary Clarifier Upgrades

At the Manchester, NH wastewater treatment facility, Methuen Industrial Services upgraded three 130' diameter primary clarifiers and three 50' diameter gravity thickners. All excavation, concrete work, piping, pumps, HVAC, and electrical was included in the work at the water treatment plant.